2021-01-15
Medicine Elevated Warehouse Project
The project is a construction project of elevated warehouse and comprehensive warehouse. The floor height of elevated warehouse is 23.5 m and that of comprehensive warehouse is 11.5 m. The elevated warehouse is equipped with 14 sets of air sewing systems, and the system air volume is 18000m ³/ h. The comprehensive warehouse adopts 14 sets of air sewing systems with an air volume of 12000 ³/ h。 The ventilation and air supply system of the two warehouses adopts blue fiber bag duct.
© 2022 All Rights Reserved Well Air Conditioning(Guangdong) New Energy Technology Co.,Ltd 粤ICP备19137042号 SEO Powered by www.300.cn